Quality

Requirements are reviewed before production starts.

Critical dimensions, weld requirements, surface finish, packaging and inspection documentation should be defined in the RFQ.

Upload Drawing ↗

What buyers need to define

Each RFQ is structured around the information needed to evaluate manufacturability, inspection and delivery.

01

Drawing and revision review

Project-specific requirements are reviewed from the RFQ and controlled drawing.

02

Incoming material verification plan

Project-specific requirements are reviewed from the RFQ and controlled drawing.

03

First article and in-process checkpoints

Project-specific requirements are reviewed from the RFQ and controlled drawing.

04

Weld and dimensional inspection requirements

Project-specific requirements are reviewed from the RFQ and controlled drawing.

05

Final surface and packaging verification

Project-specific requirements are reviewed from the RFQ and controlled drawing.

PROJECT REVIEW

Have a controlled drawing?

Send the current revision with quantity, material, finish and inspection requirements.

Request a Quote ↗