Jinyao Steel FabUpload Drawing
Case Studies

Case Studies

Critical dimensions, weld requirements, surface finish, packaging and inspection documentation should be defined in the RFQ.

Upload Drawing

What buyers need to define

Each RFQ is structured around the information needed to evaluate manufacturability, inspection and delivery.

01

Drawing and revision review

Project-specific requirements are reviewed from the RFQ and controlled drawing.

02

Incoming material verification plan

Project-specific requirements are reviewed from the RFQ and controlled drawing.

03

First article and in-process checkpoints

Project-specific requirements are reviewed from the RFQ and controlled drawing.

04

Weld and dimensional inspection requirements

Project-specific requirements are reviewed from the RFQ and controlled drawing.

05

Final surface and packaging verification

Project-specific requirements are reviewed from the RFQ and controlled drawing.

PROJECT REVIEW

Have a controlled drawing?

Send the current revision with quantity, material, finish and inspection requirements.

Request a Quote